Checklist before the test may begin:

  • To achieve a fair test result, the building envelope must be complete. This includes external doors, all glazing plus frames sealed and cladding completed.

  • Any forms of loft hatches should be finished and ideally have a draft excluder.

  • All light fixtures and socket fixtures to be fitted.

  • Window frames to be sealed between the external walls, i.e, silicone/expanding foam.

  • SVP pipes or any types of pipes exiting the envelope area should be well sealed.

  • All plumbing is installed, and all traps/U bends have water in them.

  • Skirting boards to be fixed and sealed.

  • Also noted that chimneys should be checked before we arrive on site to make sure they are properly sealed and that any flues that have been installed are not leaking.

  • Please be aware that testing cannot take place in high wind conditions.

  • Upon our visit, we will temporarily seal extractor fans and possibly trickle vents depending on when the dwelling was constructed.

  • It should be noted that to do the test we will require 240v or 110v power , if this is a problem please contact us before our visit.